SStanPal

StanPal Factory

Every hour on the floor, accounted.

Carpenter and operator logs by project, furniture item and production stage — feeding job cost and OT payroll.

Lines active

3

A · B · C

On floor

604

Shift A

OT today

46 h

Production log · 03 Sep 2026

  • Kyaw Zin08:00 – 17:00

    Reception Counter · STZ-2605-MDY-0014

    AssemblyOT 2.0 h
  • Thet Naing08:00 – 20:00

    Display Cabinet ×6 · STZ-2608-YGN-0021

    FinishingOT 3.0 h
  • Su Myat08:00 – 17:00

    Wall Panel Set · STZ-2602-YGN-0009

    CuttingOT

Stage throughput

Cutting

128 pcs

Assembly

96 pcs

Finishing

74 pcs

QC passed

68 pcs

StanPal People OS — 2026Stanza workforce operations